EUROMIX® DUO is the efficient and sustainable solution for mobile mass concrete production directly on the construction site. Just-in-time production on site avoids long transport routes, which reduces CO₂ emissions by up to 25 %. The plant is characterised by an impressive output capacity of up to 300 m³/h of concrete in DUO operation. It is ready for use round the clock and in all weather conditions, which guarantees a high degree of flexibility and fast response times.
OVERVIEW
Easy Relocation on own 3-Axle-Chassis
Concrete Discharge from Two Mixers onto One Truck
One Control Unit for Two EUROMIX® Plants in Duo-Mode
No Fixed Foundations Required
2 Pc. EUROMIX® in DUO-Installation
Version with One or Two Hopper Units
Easy Relocation on own 3-Axle-Chassis
Concrete Discharge from Two Mixers onto One Truck
One Control Unit for Two EUROMIX® Plants in Duo-Mode